News
You are here: Home » News » HOW TO BUILD A GALLON FILLING LINE

HOW TO BUILD A GALLON FILLING LINE

Publish Time: 2022-06-08     Origin: Site

The production line is mainly used for 3-5 gallon barrel drinking water. It consists of three parts: washing(heating water---sterilized water---pure water), filling and sealing.


This production line can be automatically washed, disinfected, filled, capped, counted and output, with complete functions, novel design, high degree of automation, it is a set of machinery, electricity, gas in one of the drinking water barrel equipment.

5 gallon water production line consists of empty bottle transferring, internal bottle brushing, auto de-capper, external bottle brushing, rinsing filling capping, light checker, neck shrinker, bagging, full bottle transferring and pallitizer, enabling full automatic intelligent production. The whole process is strictly controlled, which ensures the complete compliance with customer’s local standards and regulations set up by their Health Department. During filling process, secondary pollution is strictly controlled, which makes it an ultra-clean production line. It’s a most ideal, acknowledged and reliable automatic gallon water production line for companies and factories. This line is mainly used for filling pure water or mineral water of 3 & 5 gallon bottle.


Contact Info

Tel: +86 0512 58916707
Mob: +86 15062519149
Email: manager@fillex-packer.com
Add: Linjiang Green Industrial Park 90m Northeast, X202 Road,Leyu Town 215621, Zhangjiagang City, Jiangsu Province,China .
©Copyright 2020 FILLEX Machinery Co., Ltd. All rights reserved. Designed by leadong

Feedback